Bulwer Full Fuels Terminal Project
The Bulwer Full Fuels Terminal Project has been set up by BP and involves the refurbishment, upgrade and conversion of redundant crude and product tanks, ranging 30m to 86m in diameter, to store a range of imported refined fuels.
OTAC was engaged as the tank specialist company to carryout inspections and develop detailed scope of work documents complete with drawing and reference packages and budget cost estimates. The project also included the preliminary design for new Ethanol and Bio Diesel tanks, together with ITB documentation and budget pricing.
General Requirement documents were also developed to ensure alignment and conformance to API Codes of Practice, mandatory and consistent tank inspections and testing, coating applications, safe work practices, material and equipment standards.
OTAC has remained the tank specialist and client advisor as the various project stages progress through the Capital Value Process and into their Execute stages.
- Date: January 24, 2017
- Client: Johnson Group, US
- Category: Projects
- Value: Johnson Group, US